This is the latest aerial photograph of the lake project. Nearly all the changes to the structure are clearly visible, from the new beach sand to the re-sculpted lake bed. The work on the west end of the lake isn't as clearly depicted, but there are tiny construction vehicles---take a close look.
Evidence of the next stage has appeared in the grass next to the Gazebo: the construction of a bio-retention feature designed to manage stormwater run-off from Hemlock, Magnolia, and Clubhouse Drive. Current run-off flows directly into the lake, carrying with it all the pollutants it picks up as it flows downhill. Prior to this installation the city has used a shallow trench and sandbags to direct the water from the street.
Click on any of the photographs for a closer look.
No comments:
Post a Comment